3.4km Obaretin Forest Reserve Road
Ikpoba-Okha, Edo State

Pekuric constructed a 3.4 km asphalt road through the Obaretin corridor in the Ikpoba-Okha area of Edo State, near the Obaretin Forest Reserve. The road gives communities and traffic in the corridor a durable, all-weather route.
How the road was built
Project photographs record the work in stages: the asphalt base course laid between graded grass verges, and the finished, newly surfaced carriageway running straight between lines of oil palms. A road like this is only as good as the preparation beneath it, so the sequence matters: clearing and grading the route, preparing and compacting the subgrade, laying and compacting the base, then paving and rolling the asphalt to the correct thickness and density.
Equipment that keeps road projects on schedule
Road construction is one of Pekuric’s core services, supported by an owned fleet that includes motor graders, vibratory rollers and compactors, tipper trucks and a LeeBoy asphalt paver. Owning the equipment means we can mobilise quickly, control the quality of each layer and keep to programme without waiting on third parties.
Roads across Nigeria
The same approach applies wherever the road is. We build and rehabilitate roads for government, corporate and private clients in Edo State, Delta State, Rivers State, Abuja and across Nigeria. Read more about our road construction services, or contact us to discuss a road project.
- Sector
- Road Infrastructure


Have a project in mind? Let’s build something great.
Reach out to our team and we’ll get back to you with the precision and accountability every build deserves.